Landmark Roofing Solutions logo
Pitched roofs project photograph

Pitched Roofing

New Pitched RoofsLandmark Roofing Solutions

A new slate or tiled roof with the structure, weatherproofing and ventilation considered together.

Service overview

New Pitched Roofs: a roof planned around your building

A new pitched roof should give a building dependable protection without leaving awkward junctions or ventilation problems for later. Whether the roof is for a new home, an extension or another new roof structure, the covering needs to match the pitch, roof geometry and supporting construction. Landmark Roofing Solutions installs new slate and tiled roofs for your property, with the practical details considered alongside the finished appearance.

The important decisions start before the first slate or tile is fixed. Covering weight, batten spacing, underlay, insulation and ventilation all affect the finished assembly. An extension also needs a reliable connection to the existing building, with flashings and drainage that work at the junction. A considered specification helps avoid a roof that looks complete but leaves condensation, difficult maintenance or water tracking into an adjoining wall.

Landmark Roofing Solutions is a family-run business owned by Robbie Giles, with a four-person team. Customers praise detailed explanations, regular or daily updates, clean and tidy sites, dates given and kept, and competitive quotes. The aim is straightforward: understand what the roof needs, explain the proposed work clearly and discuss the next steps for your roof, rather than asking you to choose a covering without understanding the construction beneath it.

Contact Robbie to confirm availability at your property. New slate and tiled roofs carry a 25-year warranty, and the business holds full public liability and employers’ liability insurance. Call Robbie on 07832 878937 to discuss your property. The phone is always answered, including at night and at weekends, with 24/7 emergency availability if an existing roof problem needs urgent attention.

Why it can’t wait

Problems the right roof specification should prevent

A dependable pitched roof is a complete assembly, not just a neat outer covering. The inspection needs to consider how water drains, how the roof resists wind and how moisture escapes from the roof space. These are the issues to address before agreeing the work.

A covering unsuitable for the pitch

Every slate or tile system has installation limits. Using a product below its permitted pitch, or without the required headlap, can allow wind-driven rain through even when the covering looks neatly laid.

Unresolved loads and support

The supporting structure must suit the proposed covering and roof design. Changing the material or adding roof features can affect loads; structural questions need assessment rather than being left to the installation stage.

Weak connections to the existing building

An extension roof can meet walls, gutters and older roof slopes in awkward places. Poorly planned abutments and valleys concentrate water where small detailing errors can cause persistent internal leaks.

Condensation designed into the roof

Insulation without an appropriate moisture strategy can leave cold surfaces vulnerable to condensation. The roof build-up needs to address ventilation and vapour movement, not rely on the outer covering to solve an internal moisture problem.

Common mistakes we see

  • Choosing a tile or slate by appearance before checking its permitted pitch, exposure requirements and fixing specification.
  • Assuming the roof structure can carry any covering without checking the design loads and supporting construction.
  • Leaving rooflight positions, extension junctions and rainwater routes until the covering is already being installed.
  • Treating breathable underlay as a substitute for a coordinated insulation, ventilation and moisture-control design.

Our process

How the job runs, step by step

  1. 01

    Inspection, understand the roof and access

    The inspection considers the proposed roof shape, available pitch, supporting construction and how the new roof will meet adjoining walls or existing roof slopes. Robbie also considers access for scaffolding, nearby buildings, material handling and any occupied rooms below. Tell him about previous leaks, planned loft alterations and anything already known about the roof structure. These details help establish a practical scope rather than a quote based only on roof area.

  2. 02

    Diagnosis, agree the specification

    The specification brings together slate or tile selection, structural requirements, underlay, battens, insulation interfaces and the intended ventilation arrangement. The proposal should distinguish the planned work from anything that can only be confirmed once coverings are lifted. Ask Robbie how assessment and quoting will be arranged. Material selection, ventilation, junction details and any relevant Building Regulations requirements need to be considered together, so an apparently small omission does not become a separate problem later.

  3. 03

    Execution, install in a controlled sequence

    The roof layers are installed in the appropriate sequence, with covering gauge and fixings set for the chosen material and the specified junction details formed as work progresses. The sequence needs to allow for safe access, suitable weather and protection of exposed areas. Where concealed defects become visible, their effect on the agreed work should be explained before a change is agreed. Customers value regular updates because they make progress and any necessary decisions easier to follow.

  4. 04

    Testing/verification, check the complete assembly

    Checks focus on covering alignment, headlaps, fixings, ventilation routes, rooflight interfaces and drainage from ridges down to the eaves and gutters. Verification is not simply a check that the finished roof looks straight. It includes the routes by which rain leaves the roof and air moves through the specified ventilation arrangement. Any inspection needed for Building Regulations approval should be coordinated at the appropriate stage, not left until everything is concealed.

  5. 05

    Completion + warranty, understand the finished roof

    At completion, review the agreed work, the roof junctions and the condition of the working area. Discuss sensible maintenance, including keeping rainwater outlets clear and arranging checks after significant storm damage. New slate and tiled roofs carry a 25-year warranty. Ask Robbie to explain the applicable warranty terms and documentation, and keep those details with the agreed scope and any relevant approval records.

What you get

The benefits of doing it properly

Speed through better preparation

An agreed covering, access plan and sequence reduce avoidable decisions once the roof is open. That helps work progress efficiently without promising a fixed turnaround before the roof size, complexity, weather exposure and condition are understood.

Safety planned into the work

Scaffolding, edge protection and controlled material handling are part of planning roof work, not optional extras to improvise later. Discussing access early also helps protect entrances and occupied areas while work takes place above them.

Longevity beyond the visible covering

Suitable battens, underlay, fixings and ventilation support the life of the whole roof. Correctly detailed valleys, eaves and flashings help prevent local weaknesses from undermining an otherwise durable slate or tiled covering.

Cost savings from the right scope

Comparing complete specifications helps avoid paying for an attractive covering while leaving failing junctions underneath. Where sound components can reasonably remain, inspection should identify them; unnecessary replacement is not the same as a thorough roofing job.

Reliability at vulnerable junctions

Chimneys, rooflights, abutments and changes in roof slope need deliberate detailing. Getting these interfaces right reduces the risk of recurring leaks that are difficult to trace because water can travel before becoming visible indoors.

Peace of mind with clear information

Clear scope, understandable updates and a 25-year warranty on new slate and tiled roofs give you a clearer basis for decisions. Landmark Roofing Solutions also holds full public liability and employers’ liability insurance.

In detail

What matters when specifying new pitched roofs

The best-looking option is not automatically the right technical choice. Roof pitch, exposure, structural capacity and the way the building is used all influence the specification. Understanding these details makes it easier to compare proposals on substance rather than appearance alone.

Choosing slate or tiles for a new roof

Natural slate offers characteristic texture and variation, while fibre-cement slates provide a more uniform appearance. Clay and concrete tiles come in different profiles, colours and formats. The right choice depends on more than a sample: the proposed pitch, local exposure, structural design and surrounding architecture all matter. A covering should be selected within its published installation requirements rather than adapted beyond them for appearance alone.

The choice also affects the layout. Slate dimensions influence gauge and headlap; plain tiles and interlocking tiles use different arrangements. Fixings must suit the selected product and wind loading. Before ordering, consider how ridge pieces, verge details, ventilation components and rooflight flashings will integrate with the main covering. Compatible details help the finished roof look coherent while maintaining reliable weather protection.

Underlay, battens and ventilation work together

Slates and tiles shed most rainfall, while the underlay provides a secondary line of protection beneath them. Underlay laps, support and drainage at the eaves must suit the roof design. Battens provide the fixing positions for the covering, so their grade, spacing and support matter. A covering installed over unsuitable battens or poorly arranged underlay can conceal problems rather than solve them.

A breathable membrane does not automatically remove the need for ventilation. The arrangement depends on the roof construction, insulation position, membrane specification and moisture conditions inside the building. Cold roof spaces and insulated roof slopes need different consideration. Blocking the eaves with insulation, or adding ridge ventilation without a suitable overall strategy, can leave moisture trapped where it causes condensation and timber deterioration.

Extensions, new homes and complex roof shapes

A straightforward dual-pitched roof has different detailing demands from a roof with hips, valleys and dormers. Every change of direction creates another connection to manage. On an extension, the height available beneath existing windows or eaves may constrain the pitch, making early material selection especially important. A roof covering should not be forced into a geometry it cannot reliably accommodate.

Where rooflights or future loft use are planned, establish those requirements before the construction is finalised. Openings affect trimming, insulation continuity and flashing arrangements. A warm roof with insulation following the slope differs from a cold loft with insulation at ceiling level. Both can work, but the supporting details need to follow the chosen construction rather than combine incompatible elements from different approaches.

Junctions, rainwater and approvals

Water concentrates at valleys and changes direction around chimneys, rooflights and adjoining walls. These locations need compatible flashings, adequate overlaps and unobstructed drainage. Lead flashing must accommodate movement and be detailed for its location; simply adding sealant over a failed junction is not equivalent to rebuilding it correctly. Eaves details must direct water into the gutter rather than behind the fascia or onto vulnerable timber.

Building Regulations approval is normally required for substantial re-roofing, and thermal upgrades may need consideration where applicable. Planning permission is a separate question: listed buildings, conservation areas and some alterations can have additional restrictions. Establish the relevant route before work starts. Structural changes or a materially different covering load may also require professional assessment rather than an assumption that the existing roof can accommodate them.

Occupied homes and commercial premises

On an occupied home, roof work needs to account for people moving through entrances, items stored in the loft and rooms directly beneath the work. Dust and disturbance cannot always be eliminated, but discussing likely effects helps you prepare. Extensions, porches and adjoining roofs also need attention because the main roof must connect to them without creating awkward drainage or maintenance problems.

Commercial premises may have different access constraints, shared boundaries or activities that cannot simply stop during roofing work. The appropriate sequence depends on the building, not just the covering selected. Explain opening hours, sensitive internal areas and any restrictions on scaffolding or deliveries before the scope is agreed. A realistic plan should also account for weather interruptions rather than treating the proposed programme as an unconditional completion guarantee.

FAQs

New Pitched Roofs: your questions answered

The price depends on roof size, condition and materials. Access, roof shape, insulation requirements and the condition of junctions can also affect the scope. Ask Robbie about quote arrangements and what the proposed work would cover. When comparing quotes, check whether scaffolding, battens, underlay, ventilation, flashings and disposal are included rather than comparing only the headline description.

Next step

Discuss your new pitched roofs with Robbie

Call Landmark Roofing Solutions on 07832 878937 to explain what your property needs. Ask Robbie how assessment and quoting will be arranged. For an urgent roof problem, the phone is always answered 24/7.

07832 878937
  • 25-year warranty on new slate and tiled roofs
  • Fully insured · Family-run

Roof emergency?

We answer 24/7. Day or night.

07832 878937
Call 24/7Get a Quote